How to conduct quality control inspection for stand mixer by third party inspection China?

TESTCOO/October 22, 2021

How to conduct quality control inspection for stand mixer by third party inspection China?

With most of the products supply chains located in countries far away from the brand buyers, it is important to ensure the products comply with both buyer requirements and market standards before they are shipped off to their destination. Therefore, to conduct a finished quality control inspections for kitchen stand mixer at the factory before shipping can ensure final product integrity and it is significant to brand buyers.

For a finished quality control inspection, Quality inspectors will evaluate the whole batch or randomly inspect one or more samples taken from the whole set to see whether all the products have been produced correctly following the specifications and requirements, which is called final random inspection, or FRI. Now let’s see how QC process finished quality control inspection for kitchen stand mixer from the original factory. 

A finished quality control inspection checklist for stand mixer

1. Carton size/ weight check

Check the carton size and weight. Conformance per Spec. and printed information. If no specified tolerance, follow +/-5%.


2. Carton assortment and quantity check

Check the actual packing quantity/ color/ size/ style assortment which should confirm to printed information. For label and marking, make sure that the content is correct. Verify and check the rating labels on electrical components such as battery, cables, etc.


3. Product size /weight measurement /Power cord length check 

Conformance per Spec. and printed information. If no specified tolerance, follow +/-3%.

How to conduct quality control inspection for stand mixer by third party inspection China?

4. Bar code scan check

Bar code must be able to be scanned correct as printed.


5. Assembly/ installation check

Should be assembled/ installed smoothly according to the instruction manual or guideline, and no issue is found.


6. Coating adhesive tape test (also called “3M tape check”)

Place 3M 600( or same performance tape) tape for an adhesion test on all painting, foil stamping, UV coating and printing. No more than 10% peeled off area is required.


7. Rubbing test for ratin label and adhesive test for printing, marking and logo

Rub the rating label for 15 seconds with water, then for 15 seconds with petroleum spirits. If there is no failure, the test is passed.

How to conduct quality control inspection for stand mixer by third party inspection China?

8. High voltage test

Conduct the test for 1 second (5mA) at the voltage required between the tested parts (the voltage refer to the actual category product requirement or otherwise refer to below). The testing voltage required: for the USA/Canada markets: 1200Vac, for European markets: class I 1000Vac, class II 2500Vac. No insulation breakdown.


9. Power on check

The good condition samples should be operating at full load (preferable) at least 4 hours at rated voltage or time referred to the user instruction if less than 4 hours. After testing, the samples should pass the high voltage check, function check, earth continuity check etc., and no defect is found.


10. Power consumption check or input power/ current check (without load)

The power consumption /input power /current must comply with product spec. and safety standard. Normally the tolerance should be between +5% and -10%.


11. Strain relief test

To test the strain relief of the power code, use a force of 100N and the cord should not be displaced more than 2mm. UL standard: pull on the cord for 35 lb for 1 min, the cord should not be displaced.


12. Internal workmanship and critical component check

Check internal construction complement and main components according with CDF (Constructional Data Form) or CCL (Critical Components List).


13. Motor locking check

Lock the motor of the mixer under rated voltage, it should not pose a hazard to the users and the surroundings. The shell of mixer should not be ignited or burned. No molten metal appears.


14. Stability test (for freely standing unit)

Place the sample on an inclined surface at 10 degrees (15 degrees for heating appliances) to the horizontal surface. The power cord should be placed in the most unfavorable position and the appliance should not tip over.


15. Full function check (including the function which only can be checked after fully assembling)

All captioned function is well conducted as intended, such as installation/ adjusting, switch/ knob action check, setting, display, actual using function etc. All of function should be complied with claims.


16. Noise test

The noise does not exceed 85 decibels at a distance of 1 meter.


17. Smell test

No unwanted bad or irritative smell while the mixer is working or powered off.


18. Transportation drop test

According to ISTA 1A standard, the product and package should be free of critical and serious problems after test. The test drop height varies with the weight of the packaged-product. For example, the stand mixer is about 15kg, greater than 10kg but less than 19kg, then the test drop height is 24in. For more details, refer to: How to determine the test drop height of a product by ISTA 1A standard ? 

Transportation drop test

After the above field tests and everything is labelled and documented correctly, the inspector will produce a final inspection report that will enable purchaser to take immediate and early action if anything is incorrect. Read electrical inspection report samples here.

Quality inspection is important for your kitchen stand mixer

Quality inspection is important for your kitchen stand mixer

Today, using third party inspection companies is more convenient with a lower price to ensure your products meet your customers’ expectations including materials, style, function, etc.

As a third party inspection company with intelligent management for quality assurance, TESTCOO aims to build the world’ s most influential third-party inspection service center and TESTCOO QC team are with extensive experience in various manufacturing processes. Contact TESTCOO and you can make an inspection order in 5 minutes and get your detailed report in 48 hours.


Free Sample Report Performance Quality Control

Download a sample report to keep control of your supply chain!

日本女生校服| 不堪入耳的黄话怎么说| 《公与媳夫妇:交换》| 狗配人的大片| 猫为什么要吃老鼠| 《完美邻居》电影免要观看| 女人大荫蒂被添全过程| 丈夫不在家儿媳想老公的背景故事| 做完0之后屁股里流了一点血| 出门忘穿胸罩乳头凸起怎么办| 和妈妈做了怎么办心理咨询 | 成人猫咪最新地域网名是什么啥| 来真正的狗配人真人| 把腿扒开让我添30分钟| 局长边摸边吃奶边做爰| 女生给男生吃小头头| 欧美《禁忌5》| 《再来一次好吗》动漫| 澳门在线| 叶子媚| 白日梦我小说| 小岭丽奈| 古代洞房2国语版免费观看| 三个医生换着躁我一个观后感 | 国产-区| 日韩精品国产一区二区三区| 蜜桃浏览器| 极品媳老旺秦雨103章| 美国大片BGM大全播放| 《尼姑春心荡漾》大结局| 布丁动漫| 女性左腿又开腿肚子中间疼视频| 儿子找不到媳妇妈妈能以身相许吗 | 暴躁少女CSGO高清观看方法| 被灌满精子的女人会得白血病吗 | 白丝脚上的浓浓的精华波能用吗 | YSL口红水蜜桃色号8223| 爰痴癫| 《湿点》未增减板相似| 女性扒开大腿内侧小肚子痒| 电影《老公上班后》免费观看