How to conduct quality control inspection for stand mixer by third party inspection China?

TESTCOO/October 22, 2021

How to conduct quality control inspection for stand mixer by third party inspection China?

With most of the products supply chains located in countries far away from the brand buyers, it is important to ensure the products comply with both buyer requirements and market standards before they are shipped off to their destination. Therefore, to conduct a finished quality control inspections for kitchen stand mixer at the factory before shipping can ensure final product integrity and it is significant to brand buyers.

For a finished quality control inspection, Quality inspectors will evaluate the whole batch or randomly inspect one or more samples taken from the whole set to see whether all the products have been produced correctly following the specifications and requirements, which is called final random inspection, or FRI. Now let’s see how QC process finished quality control inspection for kitchen stand mixer from the original factory. 

A finished quality control inspection checklist for stand mixer

1. Carton size/ weight check

Check the carton size and weight. Conformance per Spec. and printed information. If no specified tolerance, follow +/-5%.


2. Carton assortment and quantity check

Check the actual packing quantity/ color/ size/ style assortment which should confirm to printed information. For label and marking, make sure that the content is correct. Verify and check the rating labels on electrical components such as battery, cables, etc.


3. Product size /weight measurement /Power cord length check 

Conformance per Spec. and printed information. If no specified tolerance, follow +/-3%.

How to conduct quality control inspection for stand mixer by third party inspection China?

4. Bar code scan check

Bar code must be able to be scanned correct as printed.


5. Assembly/ installation check

Should be assembled/ installed smoothly according to the instruction manual or guideline, and no issue is found.


6. Coating adhesive tape test (also called “3M tape check”)

Place 3M 600( or same performance tape) tape for an adhesion test on all painting, foil stamping, UV coating and printing. No more than 10% peeled off area is required.


7. Rubbing test for ratin label and adhesive test for printing, marking and logo

Rub the rating label for 15 seconds with water, then for 15 seconds with petroleum spirits. If there is no failure, the test is passed.

How to conduct quality control inspection for stand mixer by third party inspection China?

8. High voltage test

Conduct the test for 1 second (5mA) at the voltage required between the tested parts (the voltage refer to the actual category product requirement or otherwise refer to below). The testing voltage required: for the USA/Canada markets: 1200Vac, for European markets: class I 1000Vac, class II 2500Vac. No insulation breakdown.


9. Power on check

The good condition samples should be operating at full load (preferable) at least 4 hours at rated voltage or time referred to the user instruction if less than 4 hours. After testing, the samples should pass the high voltage check, function check, earth continuity check etc., and no defect is found.


10. Power consumption check or input power/ current check (without load)

The power consumption /input power /current must comply with product spec. and safety standard. Normally the tolerance should be between +5% and -10%.


11. Strain relief test

To test the strain relief of the power code, use a force of 100N and the cord should not be displaced more than 2mm. UL standard: pull on the cord for 35 lb for 1 min, the cord should not be displaced.


12. Internal workmanship and critical component check

Check internal construction complement and main components according with CDF (Constructional Data Form) or CCL (Critical Components List).


13. Motor locking check

Lock the motor of the mixer under rated voltage, it should not pose a hazard to the users and the surroundings. The shell of mixer should not be ignited or burned. No molten metal appears.


14. Stability test (for freely standing unit)

Place the sample on an inclined surface at 10 degrees (15 degrees for heating appliances) to the horizontal surface. The power cord should be placed in the most unfavorable position and the appliance should not tip over.


15. Full function check (including the function which only can be checked after fully assembling)

All captioned function is well conducted as intended, such as installation/ adjusting, switch/ knob action check, setting, display, actual using function etc. All of function should be complied with claims.


16. Noise test

The noise does not exceed 85 decibels at a distance of 1 meter.


17. Smell test

No unwanted bad or irritative smell while the mixer is working or powered off.


18. Transportation drop test

According to ISTA 1A standard, the product and package should be free of critical and serious problems after test. The test drop height varies with the weight of the packaged-product. For example, the stand mixer is about 15kg, greater than 10kg but less than 19kg, then the test drop height is 24in. For more details, refer to: How to determine the test drop height of a product by ISTA 1A standard ? 

Transportation drop test

After the above field tests and everything is labelled and documented correctly, the inspector will produce a final inspection report that will enable purchaser to take immediate and early action if anything is incorrect. Read electrical inspection report samples here.

Quality inspection is important for your kitchen stand mixer

Quality inspection is important for your kitchen stand mixer

Today, using third party inspection companies is more convenient with a lower price to ensure your products meet your customers’ expectations including materials, style, function, etc.

As a third party inspection company with intelligent management for quality assurance, TESTCOO aims to build the world’ s most influential third-party inspection service center and TESTCOO QC team are with extensive experience in various manufacturing processes. Contact TESTCOO and you can make an inspection order in 5 minutes and get your detailed report in 48 hours.


Free Sample Report Performance Quality Control

Download a sample report to keep control of your supply chain!

WWW.1688.COM麻豆.| 与少妇在车里做爰| 健身教练压腿压进去会怎么样| 光溜溜瑜伽全套视频大全| 美女和帅哥一起努力生产豆浆的视..| 免费观看已满十八岁电视剧在线播.. | 女人做爰高潮全黄| EXO妈妈MV高清视频播放| 七星彩开奖号码最新结果| 我的老师中字ID| 《男医生的特殊治疗》| 哈尼克孜| 麻豆| 精品久久免费一区二区三区四区| 爸爸你真棒插曲快来救救我小说| 开会也一直放里面老板的| 无码欧XXXXX在线观看免费| 孕妇| 《健身房下的特殊待遇》| 温碧霞惊变| 榨精病栋| 坠落的清纯校花沈清清小说| 《女朋友的妹妹3》| 扌暴辶鬲的短文| 11人裸体航班女服务员是谁| 《共享弟夫》动漫在线观看免费| 免费观看已满十八岁电视剧高清版| 情趣内衣秀春光| 女性肛交一次肛门多久恢复| 和教官在教室做了好爽| 绝美儿媳妇林曼晏| 疯狂祖母免费观看高清版| 《合租男女》电视剧韩国| 一家乱战60集全播放免费观看| 120分钟做爰A片免费| 《帐篷里的秘密》动漫| 老师穿白色双开真丝旗袍怎么穿| CSGO暴躁妹妹高清| 男人碰到紧的会念念不忘吗?| 女儿与爸爸高清免费版电视剧| 妈妈你真棒里面的插曲叫什么